The design plan we put together, was thorough, even by the most rigorous standards. The first level called for a series of process rooms, totaling 140,000-square-feet, to house complex proprietary production equipment, as well as clean rooms, development, testing and QC labs. The building’s process flow design, efficiency and overall environment prioritized the high-performance battery operations. The production of high volume, consistent and reliable product was almost guaranteed. But what about the people?
|